Project Overview
Structure: Concrete + Aluminum Pontoon
Quantity of Berths: 148
Yacht Accommodation: 33 ~ 330 Feet
1. The first concrete pontoon system that was approved by Hong Kong Building Department in Hong Kong history.
2. Lantau Yacht Club was awarded Five Gold Anchor certification by MIA in 2021.
3. Adhering to the design concept of “Improving utilization rate of waters”, we achieve 90% utilization rate of waters compared with previous 70%.
Discovery Bay Marina
Refurbishment Works, the first concrete pontoon system was approved by Hong
Kong Building Department since the opening of Hong Kong Special Administrative
Region. A total of 148 berths are built which can accommodate yachts from 33
feet to 330 fee (10 meters to 100 meters). The whole project including design,
production, construction, installation and maintenance were running based on
Hong Kong Building Codes and BS Standards.
Adhering to the design
concept of “Improving utilization rate of waters”, we achieved 90% utilization
rate of waters compared with previous 70%. This project has been praised “Paradise
in the downtown area” by the Hong Kong media, and has been presented on “Marina
World”, a global professional marina magazine.