News
Return

HaiHang Foundation Granted to Goodocks-Haikou Nanhai Pearl International Yacht Club-Starting Berth Area project-Concrete and Aluminum Pontoon

Time:2022-04-10The editor:www.goodocks.com
The project covered the construction works of marina yacht berth 11, including 1 berth with 161 feet yacht, 2 berth with 102 feet yacht, 7 berth for 60 feet yacht, 1 berth for 40 feet yacht, one moveable gangway and one fixed gangway.

This project was composed of main concrete pontoon, concrete finger pontoon and aluminum alloy pontoon, which concrete pontoon with 4 meters width, outer side of the pontoon uses the main profile wrapping, Surface pavement with PE decking, using D600 steel pile fixed positioning, with great stability and pretty appearance. Concrete pontoon choose prefabricated on the project site, hoisting the water drag the project site, 80% of the concrete pontoon prefabrication has been completed, site installation of the main profiles and laying the decking, prepare for maritime consignment and water installation, project plan to finish by 1st April 2017.