News
Return

New Aluminum Pontoon Marina completed in Seongju-ho, Korea

Time:2022-04-10The editor:www.goodocks.com

The pontoon installation works for this project that exported to Korea in this March was completed. There were some difficulties for the design & installation due to the drop of water level over 8m and fastening by elastic mooring chains, but through constant communication by our designers together with Korea’s sides, we completed the installation of the floating pontoon very well. The owner is very satisfied with it.